How Dutch location rules work until 2032

One address, two systems: the omgevingsplan under the Omgevingswet and the old bestemmingsplannen that remain its transitional part. A guide.

14 November 2026 ยท Erfmark

Photo: Martin Woortman via Unsplash

Since 1 January 2024 every Dutch municipality has one omgevingsplan. That sounds simpler than what came before, and in the long run it will be. Until then, a question as plain as "what may be built at this address" has two places to look, and the answer is only complete when both have been read.

The two layers

The new layer is made of Omgevingswet documents: the municipality's omgevingsplan, the province's omgevingsverordening, the water board's waterschapsverordening, national rules such as the Besluit bouwwerken leefomgeving, programmes, and preparatory decisions with temporary rules. At Catharijnesingel 26 in Utrecht, the open DSO data lists 26 documents of them, with the omgevingsplan's current version in effect since 18 September 2026.

The old layer is the transitional part (tijdelijk deel) of the omgevingsplan: the bestemmingsplannen, wijzigingsplannen and other plans made under the old Wet ruimtelijke ordening. They became part of the omgevingsplan by law and stay so until the municipality replaces them. At the same address the old layer still gives the land use (Centrum) and a maximum building height of 18 metres drawn on the map of a plan from 2014.

How big the old layer still is

In PDOK's national index of 1 July 2026, 342 municipalities together list 46,001 IMRO plan versions in force. The median municipality lists 112. The largest numbers are in municipalities that merged or have large rural areas:

MunicipalityIMRO plan versions in force
Land van Cuijk700
Amsterdam623
Barneveld620
Ede475
Dinkelland458
Meierijstad430
Apeldoorn420
Tilburg419
Hardenberg406
Horst aan de Maas404

Where a new rule switches off an old one

When a municipality writes new rules into its omgevingsplan for an area, the old plans stop applying there. The DSO records this as the pons. It is the one fact an answer about an address most needs and the open data does not hold, which is why Erfmark states it as unknown in every location answer until it has a DSO key. Read what the pons is for more.

How to read both

  1. Pin the address to a BAG object, so both layers are read at the same point.
  2. List the Omgevingswet documents at that point, with their versions.
  3. List the IMRO plans at that point, newest first, separating what is in force from drafts.
  4. Check Regels op de kaart, the legal reference, before relying on an old value.

Erfmark does steps 1 to 3 in one call, cites the PDOK query and dataset date with each answer, and says what it cannot see. Try an address or read the example for Catharijnesingel 26.

Data: PDOK, IMRO index of 1 July 2026 and DSO-LV dataset of 24 October 2026. Automated and unreviewed. Erfmark reads official open sources automatically and no person checks each answer. Data can be incomplete, late or wrong. Verify against the official source linked here (Regels op de kaart at omgevingswet.overheid.nl is the legal reference) before you act. Not legal advice and not a permit decision.