Municipality sheet · CBS 1729

Zoning plans and omgevingsplan in Gulpen-Wittem

Gulpen-Wittem lists 69 IMRO plan versions in force as the transitional part of its omgevingsplan; the omgevingsplan's current version took effect on 18 September 2024.

Omgevingsplan2024-09-18current version took effect
IMRO in force69plan versions still listed
Drafts3pending, not yet adopted
Newest IMRO plan2026-06-04in the index of 2026-07-01

The omgevingsplan

Omgevingsplan gemeente Gulpen-Wittem, identifier akn_nl_act_gm1729_2020_omgevingsplan. Every amendment makes a new version; the version in force at a point in Gulpen-Wittem took effect on 18 September 2024 (registered 2024-09-18). Province: Omgevingsverordening Limburg.

IMRO plan versions by stage

In force69
Adopted, not in force4
Draft23
Lapsed1
Unclear1

In force by type: bestemmingsplan 62, wijzigingsplan 7.

Newest IMRO plans in force

StagePlanDateLinks
In forceOvergeul ong. te MechelenNL.IMRO.1729.BPovergeulong-VG02 · bestemmingsplan2025-03-13Viewer
In forceKleinveldjesweg, WijlreNL.IMRO.1729.BPKleinveldjesweg-VG01 · bestemmingsplan2025-02-13Viewer
In forceTAM-omgevingsplan hoofdstuk 22a functiewijziging Ingbergrachtweg 9 te GulpenNL.IMRO.1729.TAMOPIngbergracht9-VG01 · bestemmingsplan2024-12-19Viewer
In forceNatuurontwikkeling De Bennet EpenNL.IMRO.1729.BPDeBennet-VG01 · bestemmingsplan2024-12-19Viewer
In forceFietsverbinding en reconstructie N595NL.IMRO.1729.BPfietspadN595-VG01 · bestemmingsplan2024-07-04Viewer
In forceEyserheide 1-1a te EysNL.IMRO.1729.BPeyserheide1a-VG01 · bestemmingsplan2024-04-25Viewer
In forceElzeterweg 2 MechelenNL.IMRO.1729.BPelzeterweg2-VG01 · bestemmingsplan2024-04-25Viewer
In forceTerzieterweg 17 te EpenNL.IMRO.1729.Terzieterweg17-VG01 · bestemmingsplan2024-04-25Viewer
In forceEyserhalteNL.IMRO.1729.BPEyserhalte-VG01 · bestemmingsplan2024-04-25Viewer
In forceTerzieterweg 9 te EpenNL.IMRO.1729.BPTerzieterweg9-VG01 · bestemmingsplan2023-09-28Viewer

Drafts in procedure

Draft (ontwerp) versions without a newer adopted version of the same dossier, as of 1 July 2026.

StagePlanDateLinks
DraftTAM-omgevingsplan Hoofdstuk 22g Wijnweg 1 IngberNL.IMRO.1729.TAMOPwijnweg1-ON01 · bestemmingsplan2025-11-28Viewer
DraftTAM-omgevingsplan Hoofdstuk 22f Schweibergerweg 3 te MechelenNL.IMRO.1729.TAMOPSchweiberger3-ON01 · bestemmingsplan2025-11-21Viewer
Draft't Veld 2-4 EpenNL.IMRO.1729.BPtveld2en4-ON01 · bestemmingsplan2023-11-24Viewer

What this answer cannot tell you

  • How much of these IMRO plans the omgevingsplan has already replaced (the pons) is not in the open data; it needs the DSO API key that is still pending.
  • IMRO counts are from the PDOK index of 2026-07-01; plans published after that date are missing.

Cite this

Zoning plans and omgevingsplan in Gulpen-Wittem. Erfmark, data of 2026-07-01 and 2026-10-24. Kadaster, PDOK, CC0. https://erfmark.bulkhead.solutions/municipalities/gulpen-wittem

Embed

A status badge for this municipality, with a link back.

<a class="badge-preview" href="https://erfmark.bulkhead.solutions/municipalities/gulpen-wittem">Gulpen-Wittem: <b>69</b> IMRO plans in force, omgevingsplan of 2024-09-18</a>